Hello M's....cnts10 Dec 2019 00:12
I said it last night and then news drowned out point. Currently drilling in Guyana a play opening target.
Okay so Carapa well is aprox 3100mtrs for TD , previous well drilled in TLW/ECO/Total partnership called Jethro was 3500mtrs and (....cough...if you believe rumours had 4 days downtime to issues ) was drilled to TD in 31 days, then a day POO pulling out of hole, day doing a clean up run, day preparing the string and then 2.5 days running the wireline to report on the 37th day.
Carapa well is only 3100mtrs aprox TD and was spud aprox 28th Oct. So far that's 43 days!!
From all the previous wells drilled in area inc those by Hess/Exxon we know there doesn't seem to be any problems geologically and the drill bits are effectively ****ing through the depths.
Considering the BoD's desperation to report to market every point this morning in detail regardless of how damaging I doubt greatly they did so concealing any update from this Carapa well....if it was **** it would have been thrown into the mix.
If Carapa was a "total" duster then it would have been known by day 28-30 of drilling with LWD/MWD tools.....Repsol are not some amateur hour operator.....it would have been included in this mornings news simple.
Please do not base this as a buy call , do your own **** with your own money , but for me unless they have had HUGE issues with this well , gas kick, equipment failure etc etc then there has to be something down in that hole to take all this time.