RE: Drilling22 Mar 2021 14:20
They may nor release hole 1 as a standalone result as they were planning follow up drilling to ascertain the extent of the reef.
Therefore the delay may be so they can provide an overview of where these limits are. So in my book it could be a case of the longer the delay in RNS , the further they have had to drill to find the limits......a positive spin.
"HR3DDH001 will aim to follow the continuation of the reef below the depth of the historic workings of the Byron mine. Subject to favourable results from the first hole, several follow-up holes have been designed to test extensions of the reefs. Section B holes have been designed to target the vein at similar depths as Section A, but to the south side of the Byron shaft. "