Is being reviewed for one 2700' gas pipeline only...…. must be the one hooking up to Bronco..... No oil pipeline.
WIP
Mr.Mendell requesting an interview with the US Patent office this week....
https://globaldossier.uspto.gov/svc/doccontent/US/201815870677.A/3-3-US%20%20158706770UP1%20/3/PDF
Oil and gas lines to hook into Bronco..... Epiphany....???
Engineering case under review..... Posted yesterday...… ?
http://pwms.arapahoegov.com/CitizenAccess/Cap/CapDetail.aspx?Module=Engineering&TabName=Engineering&capID1=18CAP&capID2=00000&capID3=0059R&agencyCode=ARAPAHOE&IsToShowInspection=
http://cogcc.state.co.us/weblink/DownloadDocument1.aspx?DocumentId=4593792
Epiphany?
I'm thinking getting it ready to flowback
"The drillout and flowback operations were to be completed within a week however a different rig was required and
the time extended another week."
Hmmm
"In June 2012, CONSOL Energy announced that it acquired a non-controlling interest in Epiphany Solar Water Systems, a privately-held company founded in New Castle, PA in 2009. Epiphany Solar Water Systems is testing what is believed to be the world's first concentrated solar powered water purification system. Under the agreement, CONSOL Energy has made an initial investment of $0.5 million and one of its Marcellus Shale gas well locations in Greene County served as the site to pilot test this solar powered water purification system."
Done and dusted.... I wonder if they still hold and interest?
They are allowed to flare gas for so many days bringing it into production.
Good question JC...… As long as they have produced from the new well I think they have fulfilled their duties to the SLB to hold onto the permit. What happens after that is another question.... maybe deal with Bronco/COGCC in the future if things don't go well with Anadarko..... who knows?
JH....Renegade has recently received permits from Arapahoe to move heavy equipment in and drill on 33. It has probably already been drilled...…. Would like to know if they are producing? If so, they will hold onto that lease. Still could make a deal .
China and Israel patents granted?...… US application 13/496951 , seem to be having a hard time getting it across the line....
Don't forget to click the "Non-IP5 offices" box...….
It looks to me as if everything has been put on hold so they can set up the Pilot Project and start testing it..... testing only to last for 9 months inclusive of flowback and production waters.