RE: FWIW14 Nov 2018 07:17
so far it looks like the 15 wells on sections 9 and 10 (on hold) are all that is left that is being applied for. "Withdrawn by Operator".
Like Fadec said, they could be looking to extend some of the horizontals, though the ones on 14-16 are already 2.5 miles long.