RE: This is surely a typo right?17 Dec 2018 08:21
Possibly not, you're talking about finished product and even if they had 10 loaders the screen and wash has a max throughput. They state that is without the second piece of equipment, so once that's installed it the loader will be more efficient.
The RNS was reasonable, I've skim read it so far, I'll look at it more in depth soon, first thought is that it has not included any update on pit 2, doesn't answer how LIND will be repaid and hasn't answered why target production hasn't been met. If I'm wrong that's fair enough, as I said I've skim read it. If it is the case why leave it out from what could have been exactly what shareholders have wanted. I have my reservations as to how long it will be before the next RNS