RE: What are we waiting for now ?????16 Mar 2018 16:47
Although, according to the Final Results, AFC had 'commenced engineering design for an up to a 1MW fuel cell system for Dunsfold,' on which planning is still to be confirmed, they state that they have actually completed the basic engineering for a ">1MW AFC Energy fuel cell system' As yet we don't know where this >1MW system is to be sited as the Stade building could only hold a 500KW system. Therefore a question one could ask, is; why is the >1MW system already ready for detailed engineering, before the Dunsfold system?