RE: If commercial30 Aug 2018 18:34
I posted this earlier today on another BB.
Right now I am as confident as I can be that HH site will be in production mode in 2019. The fun will start when they apply for planning permission. Currently restricted to vehicle movements , I believe to 20 per week. Not sure if this means 10 in and 10 out or 20 vehicles. They are also restricted to week days plus a bit of Saturday.
Based on current time restrictions each 1000bopd equates to 6 loads per day. At 3000bopd you have 18 loads which I suggest is a logistical headache and probably unacceptable to both CC and residents.
If as we , I , hope the vertical well produces 1000bopd it is likely that one horizontal well should produce at least double that. The only practical solution I can think of is to lay a pipeline. Laying an underground pipeline will not be quick , cheap , or easy to get planning permission for and will be further complicated if and when multiple sites come on stream.
For all the reasons above I am convinced that UKOG will be either be bought out by a major or at a minimum enter into a partnership with a major for reasons of expertise , finance and political clout.
Will be interesting to see how this all unfolds.