RE: BC presentation10 Nov 2018 20:08
He then goes on to estimate (based on what looks like a slide from one of SOLG's presentations!) that the high grade core is 34Mt at 1.4% Cu.
Now the actual MRE statement, based on DRILL cores, states a core of:
"Higher grade core has a current 120 Mt @ 1.8% CuEq (2.0 Mt CuEq) at a 1.1% CuEq cut off, some 60% of which is in the Indicated category (by tonnage)"
So, Brent Cook, in his arrogance, thinks that his back of a fag packet estimate from a presentation slide is more accurate than the RNS'd MRE? How can this guy be taken seriously?