RE: Underway4 Oct 2018 22:01
*Note, it was previously assumed that the Paragon Prospector 5 harsh-environment jack-up would be used to
drill the 11/24b-D well. The Prospector 5 rig is now not available to contract and therefore it is proposed that
the well will be drilled using the ENSCO 72 jack-up rig, although this is also subject to contract and availability at
the time the well is due to spud. Any data relating to the Prospector 5 rig has now been removed from this
document and, where possible, replaced with data relating to the ENSCO 72 rig. Additional data on the ENSCO
72 rig can be made available upon request. In addition, where relevant, data provided to SEPA in the CAR Licence
Application Addendum 1 Report (Ref: P1185-04-02-02) has been incorporated in this revision for consistency.