Indonesia putting pressure on all operators7 Nov 2024 18:00
Further pressure from skk migas...
dated 1st November 2024
htTps://www.kabarbursa.com/makro/96528/skk-migas-pecut-bos-bos-migas-untuk-tingkatkan-produksi-nasional
SKK Migas Whips Oil and Gas Bosses to Increase National Production
Head of the Special Task Force for Upstream Oil and Gas Business Activities or SKK Migas, Dwi Soetjipto, gathered CEOs of oil and gas Cooperation Contract Contractors (KKKS) in Jakarta, Friday, November 1, 2024. This meeting seeks to encourage SKK Migas partners to increase national production
AND
SKK Migas identified four potentials that can be developed. First, there are 301 structures with a potential of 1.8 billion barrels of oil and 13.4 trillion cubic feet of untapped gas. Second, increased production can be done through Enhanced Oil Recovery (EOR) and Waterflood technology in 12 fields, with a potential of 951 million barrels of oil.
AND
"I ask every PSC Contractor to re-evaluate and align their strategy with SKK Migas. This inventory and follow-up strategy must be submitted no later than the first week of November 2024," Dwi emphasized.
AKATARA referenced further down...There are also two projects that produce oil and gas at the same time, namely Jadestone Energy's Akatara Gas Plant with a gas capacity of 25 MMSCFD and oil of 1,100 BOPD and LPG production of 192 MT/D