RE: Re....20 Nov 2020 08:03
While looking through the Valkor website last night, I came across this paragraph and it was interesting to see, during tests, that they have already produced up to 300bopd with no sulphur content, I believe this is just one of the reasons for Valkor to negotiate a deal with Tomco.
In 2018, Petroteq entered into a management services agreement with Valkor, to bring Valkor’s process engineering experience in to help the design process. The work began with a redesign of the back end to increase reliability and capacity, resulting in a 12 API, ultra-low BS&W, heavy oil product with almost no sulphur. Further work continued through to the end of 2019, to improve the middle section efficiency for sand and oil separation while reaching steady production at rates as high as 300 bopd.
In order to complete the necessary upgrade to the POSP needed to be able to demonstrate its commerciality, as well add the Quadrise MSAR process, and to be able to run the necessary tests, Valkor has taken over the management and operations of the POSP under the Work Order. Any IP developed as result of the upgrade and from the tests to be run will be the property of Greenfield.