RE: Production cost1 Oct 2018 14:31
Kev, thanks for the comment on integrity. I asked the question on production cost, reasked and then reconfirmed. I was given a full response and explanation. $65 is a reasonable expectation based on trial runs, the new design spec of kit, the particular ore body, the geology, position and the mining operation together with the very well organised process arrangements. It is a somewhat perfect alignment. In addition, speaking after that with Fernando, he also had some ideas to further improve the quality of ore being put into system using some very good no cost initiatives. As I have alluded to, everyone I met and the equipment was all very top drawer.