A view15 Sep 2018 19:18
The existing equipment is being used to; calibrate optimum effective performance, provide operational familiarisation and training. By the time the new kit is up and running staff will be fully conversant with required set up and operation. All levels of management display high levels of competence. The extra drilling that was criticised on this board sometime ago ( there were those who proposed driving ahead straight to production) was explained in full by Fernando; His input on that decision resulted in us having a much increased resource which would have been missed were toduction plunged into- well done Fernando. All the team demonstrated impressive competence and commitment. Any enterprise required the right role to succeed, we have exceptional people and that will lead to exceptional success. We are financially sound, on target, we appear to be easily within budget, well managed with costs controlled whilst ensuring top quality equipment and infrastructure. We have local support, governmental support, lots of resource to be processed, everything we need on site ( including a lake for water). Plant design is well layed out with work carried out ergonomically and safely. We have byproducts that include tin. Installation of new equipment progressing well with meticulous attention to a we’ll planned design. MM had put together a very effective team who express strong commitment to the success of the mine. I am in all honesty amazed at the correctness of my decision to invest here. Absolutely crackerjack inmho. .....and I got to meet and spend time with some great people. Does it get better than that? .... oh did I mention our other resources.........Regua, Tourica, Portalegree....Gold.......