The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.
Summary
The mining of lithium on Cínovec is a hot topic nowadays. Lithium is a strategic
resource of the 21st century and currently is very valuable and desirable. Significant
supplies of this raw material are located in this small village in the Ore Mountains. Impacts
of mining, attitudes of the inhabitants of the Ústí region and other topics, these are the
main points this work is aiming on by using a primary marketing survey, when the
necessary data were obtained by interviewing the inhabitants of Cínovec and surrounding
villages, an analysis was then carried out and the recommendation resulting from the
investigation were proposed.
https://dspace.vsb.cz/bitstream/handle/10084/130253/KRE0218_HGF_N2102_2102T001_2018.pdf?sequence=1
Negative impacts can be expected at the start of lithium mining, but these impacts will not be significant. When approving mining are
very strict criteria have been set for the elimination of landscape disturbance and the occurrence of environmental damage. In addition, heavy traffic would be in a place under the rock, where huge halls are excavated. This would have a minimal effect on Cínovec. The entrance gallery would lead from the level of the Dubai railway station directly to the center of the deposit. The ideal would then be the transport of the extracted raw material for processing directly on the tracks, which would not create an additional load on the municipality of traffic and noise. In contrast, the positive benefits far outweigh. First of all, mining will bring a significant number of job opportunities, not only directly related to the extraction of raw materials, ie in the mine, but also in other sectors associated with mining, ie in transport, processing, production. Mining will lead to the growth of business entities engaged in the processing of extracted raw materials and further production. The municipality of Dubí will receive significant financial resources in the budget, which it can use fully for the benefit of citizens.
This could improve life in many areas in which the municipality would invest funds. Mining means a significant financial benefit for the Ústí nad Labem region and for the entire Czech Republic. The citizens of Dubí and Cínovce, who are most affected by mining, should have the most information.
Following the negotiations with the Prague Stock Exchange, new news should be announced in the given matter as soon as possible.
https://www.kurzy.cz/zpravy/566032-zajem-o-lithium-na-cinovci-prichazi-jiz-i-z-usa-odrazi-se-zaroven-i-na-akciich-cez/
Please do not disable this chat! ??
https://www.mpo.cz/cz/stavebnictvi-a-suroviny/surovinova-politika/vyzvy-seminare-a-informace-ze-sveta-nerostnych-surovin/tiskova-zprava-z-virtualni-konference-mena-energy-meet---2--a-3--listopad-2020--257640/
The speakers were selected on the basis of a peer review by an advisory committee that brings together energy professionals, industry leaders, strategic thinkers, leaders, top technical and project influencers from the MENA region and around the world. On behalf of the Ministry of Industry and Trade, the virtual conference was attended by employees of the Department of Mineral Resources Policy, and RNDr. Jaroslav Reif, Head of the Mineral Resources Policy Department on the topic: "Mineral Policy of the MENA countries, the Czech Republic and the European Union".
It is definitely necessary to inform about the development of the situation around the preparation
lithium mining in the Cínovce locality. In the last few days, I met twice in an informative meeting with the management of Geomet
s.r.o. and from the information provided it is clear that after the entry of the state through CEZ a.s. all the work was fully launched into the project. Unfinished exploration work is underway and intensive project preparation of the entire project is underway, focusing mainly on the location of the processing plant and the method of transporting the mined ore. It is still planned to transport all the extracted material by pipeline, thus ensuring virtually zero impact
on communication and nature. The pipeline would be located underground and, apart from its construction, would not be a nuisance and would mainly lead
completely outside our city. It should be at the beginning of next year at the latest
be all clear. We also agreed with the company's management that
in the next issue of our Newsletter they will publish everything about the planned mining and every month they will inform our citizens about the progress
work in preparation for the planned lithium mining. This is definitely positive information.
https://www.seznamzpravy.cz/clanek/vlada-navrhne-bruselu-aby-poslal-6-miliard-pro-chemicku-z-babisovy-rise-125234
The most expensive projects of the Ústí Region in millions of CZK.
CEZ can secure support. Don't know what Innovation Center means?
Also Cínovecká deponie a.s. she secured a nice amount.
I believe that the financing of future mining in cooperation between EMH and CEZ is secured.
https://mobile.twitter.com/LithiumIonBull/status/1319237914136543235
Mining preparation lithium on Cínovec
In 2017, the public was informed that there are large reserves of strategic mineral under the Ore Mountains - lithium, the consumption of which is growing worldwide with regard to the development of electromobility or storage of electricity from renewable sources in large - capacity batteries. Preliminary rights to lithium mining in Cínovec were owned by the Australian
EMH through its Czech subsidiary Geomet. In the spring of this year, they joined Geomet
Severoceské doly and acquired a 51% stake in this company. Severoceské doly has actively seized this opportunity for mining and thus fulfills a society-wide interest in this strategic mineral. Now
geological exploration of the deposit continues at Cínovec. It counts that
by 2023, various tests of rocks and procedures will take place
lithium mining and processing. A final economic and technological feasibility study will also be carried out. Only then will the application for a mining permit, which precedes the EIA process, be submitted.
https://www.hornicke-listy.cz/archiv/HL02-2020.pdf
Clearly and clearly, we go step by step to mining!
https://inobatauto.eu/docs/World-first%20intelligent%20battery%20launch.pdf
Neprodávejte, neprodávejte, neprodávejte za tyto nízké ceny! Osobne cekám další skvelé zprávy ješte do setkání akcionáru... :-)
https://mobile.twitter.com/CzechLithium/status/1314042125844049920