RE: How did we miss this snippet from 18th AUG rns6 Sep 2023 14:39
I missed it, the bit underneath is usually just go editors. Wint miss thing in future. Lesson learned!
Interesting that it also goes on to say ....
"The development plan for the Stockstadt Mitte segment envisages 3 wells - the SCHB-2(2.) production well and subsequently an additional 2 wells; a producer and a water injector. The aim is that these additional wells will be drilled funded from the free cash flow generated by production from the SCHB-2(2.) well.
The drill pad for these 3 wells was prepared immediately adjacent to the Schwarzbach Production facility, which is wholly-owned and operated by the Company, and conductor pipes for each of these wells were set to a depth of 85m below ground level. A flowline from the drilling pad to the Schwarzbach Production facility will allow tie-back and hook-up as these wells are completed and put into production."