Six pieces of good news for CAPD!12 Aug 2021 08:24
Following on from the four news extracts I summarised on 5th August, we now have two more lots of good news....
Altus Strategies include a nice plug for CAPD in their excellent exploration results RNS this morning:
Https://www.londonstockexchange.com/news-article/ALS/8-5-g-t-au-over-24m-at-diba-gold-project-in-mali/15095487
"Diba Project: Drilling Programme
The planned drilling programme at Diba includes up to 7,500m of Air Core ("AC") and 12,500m of RC drilling. To date, 2,989m of AC and 1,803m of RC drilling have been completed. The programme is due to recommence after the current rainy season, which ends in September. Capital Drilling Limited has been contracted to undertake the balance of the drilling programme. The programme comprises 7,000m (46 RC holes) in and around the Diba Deposit, testing potential down-dip and on-strike extensions, as well as infilling areas to increase the resource confidence. Approximately 5,500m (36 RC holes) is planned, to define and extend mineralisation at the Diba NW prospect. The drilling programme will also test the potential to link the mineralised zone at Diba NW to the current Diba Deposit. In addition, a number of priority prospects, located within 3km of the Diba Deposit, will be tested by AC drilling."
And Shanta Gold announced drilling results this week:
Https://www.investegate.co.uk/shanta-gold-limited--shg-/rns/high-grade-drilling-results-at-west-kenya/202108090704479773H/
These aren't from CAPD rigs but they say:
Two drill rigs are currently active at the Isulu and Bushiangala deposits in West Kenya, with a third rig mobilised and now expected in August.
CAPD mention SHG as a contract win in the last trading statement, so this will be the CAPD rig arriving.
They also say:
Shanta is on track to complete approximately 35-40% of total planned drilling at West Kenya by the end of 2021...
Phase 2 of the ongoing diamond drilling campaign...amounts to 75,000 m of planned drilling and is due to be completed in Q4 2022.
So that looks like at least 18months work for the CAPD rig.