This interview https://youtu.be/UEOwH1zxG0Q helps investors understand the difference from finding a vanadium resource and having to build a mine and a processing plant from scratch. The cost and time involved is extremely challenging. Compare this to the path and the incredible foresight that Fortune Mojepelo had with his acquisition of Mokopane, Lemur, Vametco and Vanchem to build a vanadium business which will not only have double the capacity of AVL's target within 3 years but be likely building there own monster plant at Mokopane whilst have the luxury of being a producer of 8400 mtV per annum by 2023. The Mokopane mine could be sized at 5000 mtV, 10,000 mtV or even higher depending on the global demand! The position Bushveld Minerals has in the global vanadium supply market is currently unique. Largo may currently be producing more V205 than Bushveld today. But in 3 years time, the picture will be very different.
* Our 2020 goals:
Bushveld Vanadium
Vametco
• Achieve target production of 3,000 mtV to 3,200 mtV
• Production cash cost guidance of US$17.20/kgV to US$17.70/kgV
Vanchem
• Achieve a production target of 960 mtV to 1,100 mtV
• Provide 2020 production cash cost in Q1 2020 Operational Update
• Progress the refurbishment programme at Vanchem
• Finalise the expected capital expenditure plans together with ramp-up profile
Mokopane
• Complete the Mokopane definitive feasibility study in H2 2020
Bushveld Energy
Electrolyte
• Advance construction of the vanadium electrolyte plant
• Implement additional, larger electrolyte rental contracts
VRFB manufacturing
• Advance VIP and identify further VRFB companies for investment
• Investigate business case for South African based VRFB assembly
Deployments
• Demonstrate business case for VRFB deployments, including delivery of the Vametco mini-grid as a funded independent power producer (“IPP”)
• Participate in the 2,000 MW South Africa IRP energy storage allocation and other African projects within the World Bank’s 17.5 GWh energy storage roll-out programme, including Eskom
• Secure partial self supply of electricity at all Bushveld operations in South Africa to de-risk potential deterioration of Eskom and the power system
* taken from the latest February 2020 Bushveld Minerals presentation (from the BMO conference)