RE: Cairn21 Jan 2020 07:36
Kraken (Cairn 29.5% WI) averaged 35,600 bopd (gross)
On Kraken, FPSO performance was significantly improved during H2 2019 and this has continued.
Two wells (a producer and injector pair) are planned to be drilled on the western flank of the Kraken field (Worcester accumulation) and be tied in and onstream before the year end. Drilling operations are expected to commence in H1 2020.