RE: INSP board is ready for the next stage22 Jan 2024 09:36
Deltalo:
The first paragraph on the In-spirit website says
" Delivering cost-effective and scalable energy solutions though exceptional engineering."
The very first word is incorrect, they've never delivered a thing in over a decade.
Look at the photos of the Stage 1 WHR system. Nothing but a dusty failed Disenco Stirling, languishing in a storeroom in God knows where. This device could only pump out 3.2 kW of electricity and about 18 kW of thermal but NOT at the same time.
You think that and it's cooling system AND control system is going in truck ?
Reality is not a strong point for the average investor here, dream on !