RE: £10 MILLION PROFIT PER YEAR FROM 2023 BUY4 Nov 2021 10:46
HeadInTheSand, Thanks very much for the Saltfleetby link. It makes interesting reading. However, now I have analysed the figures properly they do seem to back up everything that Angus have said and indeed everything that I mentioned yesterday without having had the advantage of seeing the OGA figures at that time.
In 2017 there are three months (Jan, Feb and May) where the OGA figures show Saltfleetby producing in excess of 5mmscf/d. The there are 4mmscf/d produced in March; 3 in April and July; 2 in June; 1 in August and November and nothing at all in September, October and December. This would be totally in keeping with the question that Angus answered saying that when the compressor was working properly then Saltfleetby was producing in excess of 5 mmscf/d.
The full figures are here:
January 2017 5mmscf/d
Feburary 2017 5mmscf/d
March 2017 4mmscf/d
April 2017 3mmscf/d
May 2017 5mmscf/d
June 2017 2mmscf/d
July 2017 3mmscf/d
August 2017 1mmscf/d
September 2017 0mmscf/d
October 2017 0mmscf/d
November 2017 1mmscf/d
December 2017 0mmscf/d
However, what is actually more interesting is if you go back to the figures for 2016 and 2015.
In 2016 for 5 months (Feb,March,May,June & December) where Saltfleetby is produced in excess of 6mmscf/d; there are four months (April, July, August and October) where it produced in excess of 5mmscf/d; there were two months (Jan, Dec) where it produced in excess of 4 mmscf/d and there was one month where it produced 3mmscf/d (September). So it is clear that the field easily provides 6 mmscf/d.
January 2016 4mmscf/d
Feburary 2016 6mmscf/d
March 2016 6mmscf/d
April 2016 5mmscf/d
May 2016 6mmscf/d
June 2016 6mmscf/d
July 2016 5mmscf/d
August 2016 5mmscf/d
September 2016 3mmscf/d
October 2016 5mmscf/d
November 2016 6mmscf/d
December 2016 4mmscf/d
In 2015 for the 8 months that there are a record for five of these were producing in excess of 6mmscf/d (May, June, July, August and December); one produced 3mmscf/d (November); one produced 1 mmscf/d (September) and one produced nothing (October)
May 2015 6mmscf/d
June 2015 6mmscf/d
July 2015 6mmscf/d
August 2015 6mmscf/d
September 2015 1mmscf/d
October 2015 0mmscf/d
November 2015 3mmscf/d
December 2015 6mmscf/d
It is very clear going back through the OGA figures from 2017, 2016 and 2015 that whenever the machinery was working properly the existing two wells were producing in excess of 6 mmscf/d. There were clearly problems that regularly occurred reducing these numbers down to zero but his would almost certainly be due to old and unreliable equipment, which Angus have now replaced.
We should now get all of the old 6mmscf/d production plus the benefits of increased pressure from the well having been shut in for nearly 5 years. Frankly, based on these figures it would not surprise me if the existing wells could produce around 7mmscf/d without any need for a sidetrack.