Wicked wizard28 Aug 2021 00:30
Wicked,
wasn't going to respond, but couldn't resist.
Funny to see you're supported by your new bestie, or as you described wizard on twitter:
'Only one PR bull*****er who could come up with that complete load of old b****cks and that's ***** *********. #ukog PR man and also Wizard on LSE.
Pump up that placing boys!
FOTH.'
Not sure what that (and numerous other posts) says about you two agreeing with each other (you'll have to see twitter to read what the asterisks are replacing). This is one of wizard's takes on you (16/4/21) in a reply to pboo: 'I think it is all the different characters & personalities arguing with themselves & no one knows what or if anything is true or not'
But this is priceless:-
'Penguins has never said a positive word about UKOG in 5 or 6 years'
and what has happened in the past 5 or 6 years to the projects UKOG has promoted and published resources etc. for (HH 3,500bopd, about 100bopd / BB failed, wrote off £9mm / Markwells Wood, relinquished / Holmwood, relinquished / Baxters Copse, relinquished / Turkey inaccurate mapping, drilling suspended) - though if you actually read what I've posted over the years you might find that even my supposed negative posting has often been too positive - just not as positive as posters, well, like Wizard or your earlier incarnation.
I've explained what might go wrong and why - you just made up a number that needs HH-1 to produce more oil than it did at the start of production when it produced no water, with imo as justification.
Think on this - the fractures near HH-1 are injecting water into the Portland.
Wizard,
if you read the CPR you would find that the water wasn't expected from fractures:-
'water break through – will it be edge or bottom water'
It was neither, it was from fractures and the map they used to calculate OIP has completely changed, HH-2z was planned to be updip from HH-1 - it ended up down dip. The CPR for HH is no longer valid, based on a series of false premises including that the whole Portland, not just the 'sweet spot', contributed to production.
Even the EA Geological Reservoir Parameters report dated 28/1/2021 does not mention the HH-1 water ingress, this is the only mention about water and HH-1:-
'During the HH-1 well tests in 2016 and 2018-19 no water has been produced from the Portland'
Yet the HH-2z well is identified as being used for injection - the EA report looks like a cobbled together mess of old reports without any acknowledgement of the post 2019 results, even HH-2z is just mentioned as 'the injector'
The 2018 presentation showing a 750m horizontal is still out of date - just like the last time (13 August) you tried to suggest that the horizontal was longer than planned.
22/10/2019:- ‘HH-2z aims to deliver a circa 3,200 ft horizontal section wholly within the Portland reservoir's most oil productive zone or sweet spot’.
3,200ft is 975metres.