RE: Things I got right, things I got wrong, followed by conclusion.31 Dec 2025 10:00
Quady from their own website....
"GMS has generated savings of $250M on completed projects since 2008 with a combined construction cost of $2Bn."
They have build 2 billion since 2008 over multiple projects.... who the hell would trust them with over 2 billion construction cost in one Prioject. As I say they would fail any standard prequalification.
What civil engineering firm, big enough to build Cascabel, would be mental enough to sign a contract with Solgold? Solgold would not be able to meet the requirements of sub-clause 2.4 in a FIDIC contract which is almost certainly what would be used.