RE: SP and future30 May 2024 09:37
We have 100m in the bank of which 60m is being used to mine the product, build the DMS and then sell that product.
Then we will build a flotation separater and increase production.
By the way we are building 2 DMS platforms at the moment.
We also have been drilling 2500 holes all over our site to see how much product we have on sit. Those core drillings are now being analysed and we will find out the results as soon as maybe Monday.
Do some bloody research you idiot