RE: LM1928 Jul 2016 10:50
yes looks like no gas from LM19 that we are aware of; but on oil production, again LM19 was a low cost workover, costing just 10% of what it cost to drill LM20, and look at the results announced to date. LM19 and LM14 are very evidence of the way things are heading; as long as NCT keep the higher revenue interest on new workovers it will have a major impact : )
Lutcher Moore #19
As previously announced on 8 June 2016, the LM#19 well has now been recompleted as a Frio producing well following a successful squeeze job at the 5030’ level. The well was originally a production well in a deeper horizon, the Cockfield, and following internal analysis offered itself as a logical candidate to produce in the Frio.
In excess of 400 BBls of oil were recovered during initial operations, swabbing and testing, with a three-day average of approximately 40 barrels of oil per day under natural pressure. The oil cut in the LM19 is over 50% better than that achieved by the Lutcher More 20 well (“LM20”) and the recovered volumes, thickness of payzone, and high oil cut gives the partners enhanced confidence in the quality of the Frio sands in this section of the field. The LM19 will be added to full production in due course.