RWE and Deutschland21 Jan 2025 10:12
It seems we have had a full contaminated thread removed and what were numerous pertinent and non-engaging posts with it.
kitesurfer I think we all know that the 500MW Reservation of Capacity will happen given they have paid a reservation fee for that privilege, and where we think it is.
But in the meantime focus on this years 2025 revenue guidance and what this RWE Linkedin post means
""GET H2 is our 300 MW electrolyzer project, we are currently erecting in #Lingen.
2/3 of the capacity we are doing together with ITM Power - PEM electrolyzer technology and Linde as contract partner.
Around five months after taking FID on the total project, it was a good moment together with my board colleage Dr. Sopna Sury to look how far ITM is with the production of the electolyzers in their facilities in #Sheffield, UK.
But before getting in touch with our stacks, which are almost ready to ship for Line 1 to our site in Germany, i had to undertake a laborartory electrolyser build up and commissioning competition ..
ITM is testing their membranes in this laboratory: its durability and development latter!
A pre qualification session for me you may say 😉, a development and testing step on European electrolyzer technology for ITM.
Its a good signal that the technology is developed in the UK, in Europe and gets alive with RWE in Lingen. First time already 2024 in our 5 MW pilot section and the next 100 MW going online 2025.
👉In a nutshell: we are on time underway. The Linde, ITM and RWE team, all the colleagues in the project are fully energized and with fun and professionalism working on the project to deliver a big success!
Bravo!"
Focus on the words "almost ready to ship" and "First time already 2024 in our 5 MW pilot section and the next 100 MW going online 2025.".
A 5MW Neptune V Electrolyser - €5Million Euros.
https://itm-power.com/products/neptune-5
There's another 100MW to be delivered to RWE afterwards and all other contracts on top, including HAR1 potential.