RE: Zenith End of Year Asessment - Overall Future for Zenith14 Dec 2021 19:01
Sorry to go on... the side track is to adjust the well to get the Full Djeno.
This was what AAOG subsequently flipped their plan to, after CPR on the field.
AC has only talked about the Djeno.
So my expectation from that formation, assuming the well sidetrack is correctly hits the lower layers of Djeno to be 3k BOPD gross minimum. The Djeno is largely offshore and the AAOG found it onshore, the flow rates are standard for the formation.