M-24713 Nov 2019 16:43
As well as some sign that they're actually moving the rig to C-30, and confirmation that C-37 is producing as earlier indicated, I'd like to see a twitter photo of them beginning civil works at M-247 - that would at least show that they are serious about constantly drilling back-to-back. If we proceed on the basis that civil works can only begin once the previous drill is over, and the pad pour for the new location can only happen once the rig is half dismantled, as if ZEN really were a one-man show, then it's going to take forever to get the production up meaningfully, while our major investment (the rig ) sits idle most of the time (along with most of the workforce). What is driving some investors to the door, in my opinion, is the total lack of a sense of urgency in Azerbaijan,;meanwhile AC wastes his time in Oslo.