RE: Follow the leader24 Feb 2022 19:26
re posring recent energyvoice interview with Gil...
'Drill plans
In the near term, the focus will be on Block 2B, in South Africa.
“We have a slot with the rig operator, there’s a flexible slot for August. That might move one or two months later, we don’t know exactly when,”
The prospect in Block 2B is a shallow water appraisal well, following up a discovery in 1988.
The Gazania-1 well will target a gross prospective resource of 349 million barrels, in less than 200 metres of water. The well is in the Orange Basin, where Total and Shell are drilling, but it is an independent prospect, Holzman said.
Azinam had spent $40 million on its blocks acquiring seismic and carrying out surveys......