RE: Proactive interview4 Jul 2023 10:50
Patx
I found this interview quite extraordinary. WTF have PHE been doing in the last few years? It is just 2 years since design for a 2 tpd of hydrogen DMG was validated (see RNS 29 June 2021). What was the point of getting planning permission at Protos if this was never going to be built? What was the point of ordering long lead items which were never going to be used? As KR admitted, PHE had the wrong model. He said (almost verbatim) “You can’t licence something that does not exist, or if you can’t demonstrate the technology”. So where was the DMG that was to be built at Protos? KR was very keen to brush all this under the carpet; “these things lie in the past” as he put it. So, it is not clear what PHE have been doing over the last few years, but one thing is clear, it was not building a DMG. And now PHE is back to building a mini demonstrator in S Wales with which to demonstrate the technology. As other projects have shown, building mini demonstrators does not guarantee success at full scale.
KR also discussed the difficulty of the embryonic hydrogen market, as if this was a limiting step for PHE. Hydrogen is not only product from the DMG; what happened to electricity?, syngas?.
KR said in essence ‘Forget the past, we are now on a new track’ He had better be right.
There can be no more delays or excuses.
Moab