Andacollo Oro Gold Project11 Mar 2026 20:45
Andacollo Oro Gold Project Overview
The Project is located in the Coquimbo Region, Chile, approximately 55 kilometres southeast of the coastal city of La Serena, at a low elevation of 1,100 metres. The Project includes a substantial permitted footprint with mining concessions, land title, and water rights in place. Extensive earthworks, mine infrastructure, and three leach pads remain on site with excellent access to infrastructure, services, and a skilled workforce.
A historical mineral resource estimate(1)(2) for the Project estimates its measured and indicated mineral resources at an aggregate of 2.02 million (M) ounces (oz) of gold (Au), consisting of 130M tonnes (t) at 0.48 Au grams per tonne (g/t) and estimates its inferred mineral resources at 5.06M oz Au, consisting of 358Mt at 0.45 Au g/t. The historical mineral resource estimate is derived from the National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") technical report titled "CMID SPA, Andacollo Oro, Chile, Technical Report" prepared by GEOINVEST SAC E.I.R.L. Chile, with an effective date of August 23, 2021 (the "Historical Report").
The Historical Report states that the Project operated as a 20,000 tonne per day (tpd) open pit heap leach operation, producing a cumulative 1.12M oz Au between 1998 and 2018, with peak annual production of approximately 135,000 oz Au.