RE: Load #2512 Oct 2018 22:39
Dear Squificus Maximus....
AK is getting back to where should be, can sense...
Scolty/Crathes will be fixed next year, Scolty will do 4-5k bopd gross... Not sure about Eagle field for 2019, but possible.
Alma etc, can only go on what said at interims... Following by Bob Davenport !!!
"As I mentioned earlier, in August, we have completed the 3 ESP replacement workovers at Alma. And aggregate production is now improved as planned, and all major shutdowns have been completed in the CNS area.
Focus for the second half of 2018, therefore, will be on maintaining high uptimes; optimizing production from the 3 new ESP replacements at Alma and Galia and at Scolty/Crathes via lift gas cycling; preparing for the Scolty/Crathes replacement pipeline, which is scheduled for the summer of 2019; and of course, progressing technical and commercial work to monetize the nearby Eagle discovery.
In summary then, at CNS, production is below the same period last year, but steady with high uptime and now higher in the second half following the 3 ESP replacements. Further production growth will come from the Scolty/Crathes pipeline next year and potentially from Eagle."
Love ya
MO
PS... AS now doing 8 knots lol