Webinair23 Dec 2025 15:54
$150,000 DOLARS A DAY??? Not much of that was spent talking about. Then obviously a coil tubing unit with nitrogen to reduce Bottom hole pressure.50k a day. Then the well test skid at 50k a day. Thought this was a free flowing well. BHP should drop as water is cleared and gas is the main driver. Not apparently. Need nitrogen injected at the bottom of the vertical section to kick start the well.Been here too long to take a massive hit. Will have to wait.