RE: Permit to flare?21 Jul 2025 16:26
So the well was drilled in July August. Permit to flare was asked for after the well drilled? This time they know I hope they have gas. So start drilling. Go through the zone for the horizontal. If gas and oil present apply for flaring. Meanwhile drill the lower zones while waiting. This is not tricky. If they applied for a flare permit now AND they said 3 months. They would waste a month.