RE: Master Plan?12 Jul 2022 13:13
27/5/2022 audited results rns:-
Non-current assets
As part of the December fundraising, AEG acquired the remaining 50% of the joint venture from PDI. Know-how of US$400,000, acquired during the CoalSwitch® production period, was recognised. Going forward with the construction of the CoalSwitch® facility in Ashland, AEG will own 100% of the assets and operations of the facility.