RE: I wonder14 May 2025 18:33
Drilling operations - To further optimize our existing Cascadura infrastructure, our preliminary 2025 capital budget includes the drilling of four gross (3.2 net) Cascadura development wells. Two wells are expected to be drilled from pad B in the first quarter of 2025, followed by two additional wells from pad C in the third quarter of 2025.
Operationally a total shambolic performances that continues.