RE: Potential20 Jun 2019 17:51
Taking Moz (in pure isolation) points to that as you say, Bcl42.
At 65% of 150Mw, that is 97.5Mw attributable to Kibo and 127.5Mw at 85% (if they take the option to up the stake). Looking at Kibo’s peers, take TOLU for example then a PPA for 97.5Mw (Kibo’s share) starts to make our MCAP look ridiculously cheap.
That’s before Moz is potentially upped to 300Mw at our 85%, before Bots at 85% at 300 / 600Mw, before Tanzania’s 100% (if and or when it comes to anything) and before our 60% of MAST.
Is it grim here at present? F*&^ yes. But it can change on a dime.
JD