RE: British Volt Giga factory ready to make EV batteries end of 202417 Jun 2022 12:16
Blyth Gigafactory, indeed any UK gigafactories and many, if not all European gigafactories, all have a refined and/or raw material supply issue. GB will need to import either for years, if not indefinitely, beyond Blyth’s hoped for start date in 2024, quite aside from the other outlined sites.
Does, or will, the EU or the member states have the resolve to cut through what is perhaps a preferred liberal self determination mindset to develop its own raw material supplies, or are they going to join the UK in forever importing basic raw materials that they could supply for themselves.
If they ever do, and if charity begins at home, then I for one would be quite surprised if much of MdB’s production found it’s way to Blyth. Will be quite happy to stand a supper at the Fish Shack or Potted Lobster if the blockchain technology proves otherwise.