miracle of the five loaves and two fish15 Mar 2022 09:36
The feeding of the 5,000 is the only miracle aside from the resurrection recorded in all four gospels but there is more chance of me believing that than the story of Loxley.
How did UKOG get from no mention of gas when they got the licence here
13 June 2016 Furthermore, the licence contains a further mapped gas appraisal opportunity, in the eastern extension of the Godley Bridge Portland gas discovery.
27 February 2017 Nutech’s calculated Kimmeridge P50 OIP figures of 7,100 MMbbl within PEDL234, of which 1,700 MMbbl lie within the limestones,
gives comfort to this viewpoint.
2018 CPR A recent review by Xodus of the interpretation of wells and seismic shows that there is potential that the Godley Bridge discovery extends into PEDL234.
To account for these uncertainties Xodus considered a number of possible scenarios. In all scenarios there was gas bearing reservoir on PEDL234 however, more data is required to properly estimate the in place volumes. Recoverable volumes were not estimated at this time due to the inherent uncertainties. Xodus believes that a further modern appraisal well and extended test is required to narrow the current uncertainties and enable a better estimation of potential recoverable resources to be undertaken.
Previous CPRs for IGas, the operator of PEDL235, have calculated estimates of Contingent Resource of between 5 and 10 bcf net to IGas. There is no comment on the discovery extending into PEDL234 and maps are cut off at the licence boundary.
31 March 2020 Note that UKOG's calculated 28 billion cubic feet (bcf) share of gas in place for Loxley Portland is not included.
21 September 2020 Reported high case net PEDL234 GIIP and estimated high case recoverable resources are 76 bcf and 54 bcf, respectively.
to here?
15 April 2021 For the Loxley Portland gas discovery, Xodus Group provided an updated volumetric report which calculates the discovery contains a significant mean case gross gas initially in place ("GIIP"), i.e., gas in the ground before any future production) of 49 billion cubic feet ("bcf"). The portion of GIIP estimated to be recoverable to surface via any future production, the mean gross recoverable resource, is cited as 34 bcf, representing an estimated recovery factor of approximately 70%.
NB The 15 April 2021 Annual Report does not agree with the RNS dated 21 September 2020