RE: Rhein Petroleum update25 Apr 2024 16:48
From Rhein statement yesterday:
“The existing well will be used unchanged up to a depth of around 1,600 meters and will receive a newly drilled branch from there,” explains the Rhein Petroleum managing director. "Immediately after the end of the drilling, the test production is prepared, including inserting the delivery pump."
My understanding is that the initial delivery pump will be a rod pump which I believe has a limit of 250 bopd. After the well has cleaned up I believe this will be replaced with an electric submersible pump which will be able to handle flows in excess of 250 bopd. As I have said before, I am hoping for 500 bopd but if its more I won't be arguing.