RE: Weekend27 May 2024 10:08
Grey Panther - This is what Peter Appel had to say 24th April just PRIOR to the current sidetrack:
“The tested production rates from the existing well do not do justice to the proven petroleum reserves in the Pechelbronn layers. The drilling fluid, which consists primarily of starch, has too tightly sealed the rock pores through which the oil flows into the production line in the immediate vicinity of the borehole. Therefore, the expected quantities of oil are not coming through,” explains Rhein Petroleum managing director Peter Appel. That's why a new entrance is now being laid at a depth of around 1,600 meters. He makes it clear: “The natural porosity, i.e. the permeability of the rock, is good. We are confident that the new short branch line at the end of the well will result in a flow rate that reflects the quality of the reservoir we encountered last August,” emphasizes Appel.
Looking forward to good news very shortly.