RE: What was promised Vs delivery3 Apr 2026 19:00
From Leon:
Molefe mine recommenced delivery of ore to Sable refinery during September 2025 following the expansion of pit 2 reaching 1 122t delivered for Q1 FY2026. Molefe mine's production ramped up to reach the targeted 3 500t of high-grade ore delivered for the month of October 2025 and is on target to reach to reach the further step-up to 4 500t of high-grade ore by the end of November 2025, targeting 8 500t of high-grade ore delivered for Q2 FY2026 (seasonal rain dependent).
The lower grade ore (0.7% Cu) continues to be stockpiled on site exceeding 2Mt of ore by the end of Q1 2026 and growing at a rate of approximately 70 000tpm