Honestly27 Sep 2022 15:00
dont know what to make of this. Are they really saying 150,000 cu ft per day is enough? Feels like they have not just moved the goalposts but carted them of the pitch.
First we were told that the target for the refrac was 2 mmscfd for two zones which would equate to the 4 mmscfd for a new well with 8 zones which was needed for robust economics. Then in my email exchange with Roland, he said 0.5 mmscfd from the refrac would give 4 mmscfd for a new well with 8 to 10 zones. Even that didn't add up mathematically. Now we are told that 0.15 mmscfd will give us the 4 mmscfd from a new well, and that there will now be 12 to 24 zones.
12 zones would give 1.8 mmscfd and 24 zones 3.6 mmscfd.
I want to believe, I really do, but on the face of it, something doesnt seem. Somebody please convince me, and please dont just say if Roland says it's ok, it must be. We are currently at 7.5 % of the original target.