What production level would be: bad, acceptable ok, good, very good, excellent and mind blowing7 Aug 2021 08:52
Looking at what was produced in the 17 working days of June, during which time we had at most 5 days working on the high grade ore areas we produced an average of a little over 3.27 tons per day so in my view if we were to produce less than that average it would be bad, a similar or slightly higher production level would be ok, and higher than that depending on just how much higher would be good, very good, excellent or mind blowing:-
Bad = under 72 tons
Acceptable = 72 tons - 79 tons (79 tons is 10% higher)
Ok = 80 tons - 93.5 tons (93.5 is 30% higher)
Good = 93.6 tons - 108 tons (108 tons is 50% higher)
Very good = 109 tons - 122.3 tons (122.3 tons is 70% higher)
Excellent = 122.4 tons 136.7 tons (136.7 tons is 90% higher)
Mind blowing = 143.9 tons or more (143.9 tons is double the June daily production rate)
I suspect that we will find out during the coming week, here’s hoping for an excellent result or better ;-)