Busy 6 Months11 Jul 2025 07:21
· Heron-1:
o Reducing operating expenditure at the producing Heron-1 well through a low-cost switch from diesel fired power to grid electricity.
· Heron-2:
o Low cost testing operations at Heron-2 well which was proven oil bearing in 2024.
· Gazelle-1
o Low cost testing operations at Gazelle-1 which has good log indications of potentially productive oil pay.
o Positive results from Gazelle-1 will also provide information to determine an appraisal strategy for the structure.
· Gobi Bear-1
o Perform a test of Gobi Bear-1 where in 2024 logs identified a zone of interest in which geochemical studies on well cuttings indicated that migrated oil may be present.
o In the event of success at Gobi Bear-1, this could add significant oil resources in Block XX.
The planned well testing constitutes a low cost, potentially high impact programme to be conducted over the next 6 months in parallel with ongoing efforts to introduce partners to the Block XX assets to accelerate their development, production ramp up and revenue and so increase shareholder value.