MMG Interim report is ejoyable19 Sep 2024 21:13
Rousey, [19/09/2024 18:31]
MMG Interim report" Khoemacau
Regional exploration in the first half of 2024 focused on the Banana Zone corridor and the Zone 5 corridor.
At Banana zone, the drilling tested the southwest fold hinge (Chalcocite deposit), targeting three areas higher
up stratigraphy that have been delineated from airborne electro magnetic data. These targets are located within
the favourable siltstone unit that is higher up stratigraphy away from redox contact, near prominent structural
features, and in gaps in conductive units. In the Zone 5 corridor, infill drilling was conducted between existing
drill holes for growth (exploration) purpose at the Zone 9 prospect. The drilling focussed on the 1.5km long
central portion of the prospect to confirm width and grades of this high-grade area."
Rousey, [19/09/2024 18:32]
"In addition, the company is dedicated to completing the construction of an expansion project by 2028, which
aims to increase production capacity to 130,000 tonnes of copper. It is expected to reach full capacity by 2029,
further contributing to the reduction of C1 costs." more than doubling present volumes"
Now I wonder where that "high-grade "mineralization goes ......?? !!! Does it dramatically stop at the license border or carry on right across someone's license ??