RE: Heading Into the 5s?20 Jul 2025 17:31
.."We need port news and more on the CEE Mou..."
Re port, maybe time for Arise to use its connections to make headway on its development....and for the CEE MoU (Feb 2025) to put some meat on the bone....if there's any bone, that is.
CMEC - with whom ZIOC has/had ANOTHER MoU (18 months ago Dec 2023) for Project hydropower incl finance at an unspecified location(s), appears to have cooled on C-B after its well-publicized problems with Imboulou dam last year :
.."The Imboulou hydroelectric facility, built by CMEC and inaugurated in 2011, has experienced serious structural degradation over the years. A technical report from late 2024 revealed localized collapses of concrete in front of the powerhouse, infiltration issues from the reservoir, and deterioration near key transmission infrastructure.
CMEC attributed much of the damage to the removal of on-site civil engineering supervision, which had been part of the original contract but was later cut for budgetary reasons.
Without that oversight, maintenance responsibilities fell to local staff, and CMEC claimed those weren’t adequately fulfilled.
The situation escalated to the point where CMEC warned of potential collapse risks and urged comprehensive geotechnical investigations and structural reinforcements. They also noted that unit 2 of the power station remained unrepaired despite earlier recommendations, and that the system was dangerously overloaded."
[Ed.: This (lack of maintenance) appears to be a systemic issue in C-B, a depeches last week reported
.."The President of the Republic, Denis Sassou N'Guesso, criticized during the Council of Ministers on July 16, the advanced degradation of the infrastructures built at great expense on the occasion of the 50th anniversary of the African Games in 2015, and ordered the immediate establishment of a task force responsible for rehabilitating them..."
This would be the same stadium that was being 'urgently upgraded' 3 years ago, per
https://www.adiac-congo.com/content/stade-alphonse-massamba-debat-la-deuxieme-phase-des-travaux-attendue ]
Meanwhile the 'deus ex machina' solution to all the country's power needs - Sounda Dam - announced with much fanfare at FOCAC last year (ANOTHER MoU , Sept 2024), seems also to have gone quiet (ground-breaking was indicated for H1 2025...).
Marginally more within ZIOC's gift are (or should be)
(1) the NPV upside of its planned DRI product (RNS'd as 'in process of COMPLETION' a month ago, the results of this to 'be announced SHORTLY'); and
(2) the identity of the tester and believed EPC contractor, PSEI, which would add to the credibility of the claimed upside - and indicate that company's continued commitment to the Project.
I'd like to think that ZIOC management lack of engagement with PI's is because it has bigger fish to fry, but unhelpfully if understandably there's no evidence of that, either.
Ho hum
GLA