RE: Te7 pre stimulations11 May 2019 09:54
Hi Joe
I think we can expect the flow rate at TE10 to be around 1.5mmscf. Which I admit does not sound like a lot, but this well placement was sub optimal for both the closure and the trap, was not designed as a producer and is vertical ( not horizontal).
Ultimately this gas discovery with the addition of SBK has shown there are more discoveries to be made all over the license.
As previously communicated, based on the Company's assessment of the reservoir section, a stimulated flow rate of approximately 1.5 mmscf/d to 2mmscf/d, is likely to be commercial (as a tie-back development to the TE-5 Horst existing discovery).