RE: Solar tender for Barapukuria coal site π₯Έ24 Apr 2026 13:23
If not Shouston it would be good building materials for Rangpur development projects. Anyway there is an EPC rns 29/12 ' It is acknowledged that working under the MOU, the parties have already taken a significant step towards developing the Phulbari coal mine. This is demonstrated by the signing of an EPC contract for "Phulbari Coal Mining Infrastructure Construction and Overburden Stripping", which was announced by the Company on 11 March 2024. The scope of work under this contract includes the design, procurement, installation and commissioning of mine infrastructure and overburden removal, dewatering and drainage. It also includes selective mining and stockpiling of valuable industrial mineral co-products that occur in the overburden and are expected to deliver considerable cashflow for the Project ahead of any coal extraction. Importantly, the proposed mine development is now heading in the direction of contract mining which means that the mining is carried out by an experienced mining contractor utilising their own resources and mining equipment resulting in reduced technical risk and start-up capital expenditure requirement.' There will be a rail connection to Teesta and therefore overburden and coal can travel to barges there. mankiniparty needs to put his practical hat on and see how the area will develop.
YKIR is probably paid by chatgpt- they need lots of different views to provide their misleading dross hence his output. Amazing how the 10.41 post today from AI is a mirror image of LSE discussion!