RE: Going forward17 Jul 2024 08:55
I think time for a quick update if there are any new posters on here.......
Caspian Sunrise Summary.
BNG:- 1561 sq Km contact area, 40 Km from Tengiz (Nearology)
MJF:- Cretaceous/Jurasic independent 4 way dip enclosed structure Shallows Export licence to 2043
141:- Spud 2015 depth 2500m Sidetrack commence Dec 2023 27m of stuck pipe
142:- Spud 2015 depth 2500m Dec 2023 new sidetrack, 3 intervals, 1 now flowing at 160 BOPDs
143:- Spud 2013 depth 2750m Tender for pipe lines to GZU Oct 2023
144:- Spud 2017 depth 2750m up to 700 BOPDs 7mm choke
145:- Spud 2017 depth 2750m Workover failed Feb 2024
146:- Spud 2017 depth 2750m
150:- Spud 2019, 1st infill well, up to 500 BOPDs
151:- Spud 2020, 3rd infill well, to be re-drilled horizontal
152:- New well planned as a horizontal drill
153:- Spud 2020 depth 2503m Workover in prog was producing 830 BOPDs 8.5mm choke
154:- Spud 2021 depth 2548m, up to 645 BOPDs
155:- TD reached, oil detected over 22m length, perforated 16m, flowing at 900 – 1000 bopd
South Yelemes:- Cretaceous/Jurasic fault and dip bounded Shallows Full production/export licence to 2046
54:- Soviet sub economic 30BOPD workover Q1 2024 2000m targeting Dolomite interval
805:- 160 BOPDs, 2222m targeting Dolomite, Sidetracked 2200m-2300m Jul 2024 flowing at 250BOPDs with 806
806:- Targeting Dolomite Sidetracked 2200m-2300m Jul 2024
807:- Workover Q1 2024 2000m targeting Dolomite
808:- Spud 2017 3200m 6 intervals potential new structure, drilled to 3070m, inconclusive testing, high water saturation, 2 shallow intervals of interest not yet tested
815:- Spud Jul 2024, TD 1900m expected to take 2 months, targeting Dolomite interval at 240m 12/7/24
Yelemes Deeps:- Upper Devonian/Lower Permian 36sqKm Salt layer typically 3000m – 3500m
801:- Sinopec drill, spuded Dec 2014 Drilled to 4950m/5050m? Jul 2015, abandoned not commercial Jul 2024
802:- Spud 2022, stuck pipe, work halted Total depth 4200m flowed at 700-900 bopd 100m earlier than expected looking for partners
803:- Spud Dec 2023, Primary target 3950m, secondary 4200m oil detected over 60m 3360m-3420m, above salt layer testing underway of 15m
804:- New well planned
Airshagyl deeps:- Upper Devonian/Lower Permian 58sqKm Salt layer typically 3700m – 4000m
A1:- Maps only
A2:- No mention on any maps (Possibly old Soviet era well)
A3:- Maps only
A4:- Maps only
A5:- Stuck pipe removal partially successful , 63m interval flowed at 3800 Bopd 19mm choke for 15 days Dec 2017, flowed at 1500 Bopd 12mm choke Feb 2019 for 40 days. New sidetrack from 3769m to 4405m required rig now removed Jul 2024
A6- Drilled 2015 to 4516m Chemical treatment required Jul 2024
A7- Paused at 2150m to be continued to 5300m Q1 2024 interval of interest at 4000m G70 rig required
A8- 3 oil bearing intervals, now abandoned
A9 New well planned to find perimeter of Airshagyl TD 5300m targeting Jurassic prospect
A10 New well planned