Arbuzovskoye 112 Well21 Mar 2013 10:05
Just noticed this well is missing from the latest operational update.
The following was stated in the RNS dated 8th Feb:
"Arbuzovskoye well 112 has been successfully tested at an initial rate of 140 bopd with no visible water cut. The well is currently shut-in for long term pressure build up testing before it is put into long-term production."
So, assume 112 well is still not operational and not included in production figures (it says this in RNS 8.2.2013)
and we will receive update once pressure build up complete and the well is up and running which would bring us up to the 3,000 bopd level.